	Solar Panels: Poly

5 KW ROOFTOP SOLAR SYSTEMS

INR 336262.5

5 KW ROOFTOP SOLAR PLANT (Suitable for monthly light bills of Rs 15000-18000) SCOPE OF SUPPLY: * Solar PV Panels 330 Wp 15 Nos. (SOVA, RENEWSYS, WAAREE) * Solar String Inverter 5 KW, 1ph * ACDB 2 pole with MCB & SPD, * DCDB 2in-2out with 15 A fuses and SPD, * Module Mounting Structure HDGI, * PV cable 4 SQ mm, Seichem, 50-100 mtr max * AC cable 6 sq mm, 3C, Flexible Cu, 20-50 mtr max * Earthing Set 1 m 50 mm OD GI Pipe, 3 Nos. with BFC * Lightening Arrestor,25 mm OD Cu pipe with spikes * Net meter 1 pH, 10-40 A HPL, * Earthing cable, 4 sq mm, 1C, Flexible Cu, 30 mtr * GI Strip 25x3 mm, 30 mtr max * Cable ties, hardware and accessories * installation, testing and commissioning Approximate Price: Rs 3,20,250.00 GST 5% Rs 16,012.50 Total Price: Rs. 3,36,262.50 Optional elevated structure of 7-10 feet height extra Rs 25000.00 + GST 18% Rs 4500.00 = Rs 29,500.00 SHAMS POWER'S SCOPE OF WORK: Complete design, engineering, supply, installation, testing and commissioning of solar system including net metering and subsidy application procedure WARRANTY:  One Year complete System warranty  Inverter: 5 years from the date of invoice  PV Panels: 10 years manufacturer’s product warranty against manufacturing defect and 25 years performance warranty for min 90% out at the end of 10 years and 80% output the end of 25 years. SUBSIDY: Available at Rs 14100/ KWp for residential and non-profit organization only. POWER GENERATION ESTIMATES Yearly Power Generation (Units):  6500-7500  Monthly Power Generation(Units):    600-750 Daily Power Generation (Units): 20-25 INVESTMENT & EXPENSES                System Cost (Rs):        3,20,250/-  Yearly Maintenance Cost (Rs): Nil Subsidy (Rs): 70,500/- Net Cost after Subsidy (Rs): 2,49,750/- SAVINGS ESTIMATES                Monthly Saving in Light Bills (Rs):6000-9000 Yearly Saving in Light Bills (Rs): 60,000-90,000/-  Payback Period:   35,40 months  Other Info                Area Required on Terrace: 400-500 sq ft Maintenance Required: Regular Panel cleaning Project Implementation Period: 6-8 weeks Net Metering Procedure Period: 2-3 months Backup During Power Shutdown: No / Optional Periodic Replacement Cost: None CONTACT: SHAMS POWER SYSTEMS PVT LTD Office: No.3, Shantikunj Society, Wanowrie, Near Kedari Garden Marriage Hall, Pune 411040 Email: info@shamspower.in Mob: 9372402738 / 7774033073 Website: www.shamssolar.in

Have any question or need any business consultation?