Central subsidy (CFA) for homes
| System size | Central subsidy* |
|---|---|
| 1 kW | ₹30,000 |
| 2 kW | ₹60,000 |
| 3 kW and above | ₹78,000 (maximum) |
₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW. There is no additional central subsidy above 3 kW. The subsidy is paid to your bank account after commissioning and inspection.
Who can claim
- Residential, grid-connected rooftop systems only.
- Installed by a vendor registered on pmsuryaghar.gov.in.
- One subsidy per electricity connection.
- Apply on pmsuryaghar.gov.in through the registered vendor. Scheme helpline: 15555.
New: Gujarat’s additional state subsidy
- For residential systems up to 2.18 kWp commissioned on or after 22 Oct 2026 under PM Surya Ghar.
- You pay 10% of the benchmark cost (5% for SC/ST households); the state covers the remaining eligible cost after the central subsidy.
- You cannot add more rooftop capacity for 3 years after taking it.
- GUVNL is the nodal agency.
2 kW with the state top-up, or 3 kW without it?
A system up to 2.18 kWp can get both the central subsidy and the state top-up, but locks your capacity for 3 years. A 3 kW system gets the maximum central subsidy but not the state top-up. Which is better depends on your usage and roof. The calculator shows both, and we explain the trade-off at the free survey.
Housing societies (GHS / RWA)
₹18,000 per kW for common facilities, up to 500 kW. Confirm the current rate on pmsuryaghar.gov.in before applying.
Solar loans
Collateral-free PM Surya Ghar loans from nationalised banks, up to 10 years, with interest linked to the repo rate, subject to bank approval.
Net metering & your DISCOM
Net metering in Gujarat follows the GERC Net Metering Rooftop Solar PV Regulations, 2016 (as amended). Residential capacity is not limited by your sanctioned load. Your DISCOM (UGVCL in North Gujarat, MGVCL in Central Gujarat, DGVCL in South Gujarat, PGVCL in Saurashtra & Kutch, or Torrent Power in its licensed city areas) inspects the system and installs the net meter.
The GERC DRES Regulations 2026 (net billing, virtual net metering) are still a draft and are not the rules in force today.
Documents to keep ready
- Latest electricity bill
- Aadhaar
- Bank details (the subsidy is paid by direct benefit transfer)
- Property / roof ownership proof
- Photos of your roof
* Subsidy, savings and payback are estimates. Actual amounts depend on eligibility, system size, DISCOM approval, tariff and the scheme rules in force at the time of application. Shams Solar is a private solar installer, not a government body.
Questions, answered
How much subsidy can I get for rooftop solar in Gujarat?
Under PM Surya Ghar: Muft Bijli Yojana, the central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW, up to a maximum of ₹78,000. There is no extra central subsidy above 3 kW. Eligible homes with systems up to 2.18 kWp commissioned on or after 22 Oct 2026 can also get Gujarat's new state top-up.
What is Gujarat's new state top-up?
For residential systems up to 2.18 kWp commissioned on or after 22 Oct 2026 under PM Surya Ghar, the consumer pays 10% of the benchmark cost (5% for SC/ST households) and the state covers the remaining eligible cost after the central subsidy. The beneficiary cannot add more rooftop capacity for 3 years. GUVNL is the nodal agency.
Who is eligible for the subsidy?
Only residential, grid-connected rooftop systems installed by a vendor registered on pmsuryaghar.gov.in. One subsidy is allowed per electricity connection.
How and when is the subsidy paid?
You apply on pmsuryaghar.gov.in through a registered vendor. After the system is commissioned and inspected, the subsidy is paid directly into your bank account. Scheme helpline - 15555.
How much roof space do I need?
Roughly 80 to 100 sq ft of shade-free roof per kW. The exact figure depends on your roof's shape, direction and structure, which we check during the free site survey.
Will my solar work during a power cut?
An on-grid system switches off during a power cut for safety. If you need backup, a hybrid system with a battery keeps selected loads running.
Can our housing society install solar for common areas?
Yes. Housing societies (GHS/RWA) can get ₹18,000 per kW for common facilities, up to 500 kW [to be confirmed on pmsuryaghar.gov.in before applying]. We help prepare the proposal for your committee or AGM.
Can I get a loan for rooftop solar?
Yes. Under PM Surya Ghar, banks offer collateral-free solar loans for up to 10 years, with interest linked to the repo rate. Loans are subject to bank approval.